46 CAH-SVX01B-EN
Installation - Mechanical
Duct Connections
All duct connections to the units should be installed in accordance with the standards of the
National Fire Protection Association (NFPA) for selecting and installing of air conditioning and
ventilating systems other than residence type (NFPA 90A), and residence type warm air heating and
air conditioning systems (NFPA 90B).
To ensure the highest fan efficiency, duct turns and transitions must be made carefully, minimizing
air friction losses and turbulence. Proper duct work installation by such organizations as SMACNA
(Sheet Metal and Air Conditioning Contractors National Association, Inc.) should be adhered to.
Bottom Opening Duct Installation
1. Install gasket to duct flange to ensure air tight seal.
2. Install duct into place underneath framed opening in unit base per Figure 40. Refer to factory
curb layout provided with unit submittals for duct size and location.
Figure 40. Field-supplied duct connection to AHU bottom supply/return air opening
Bottom
supply/return
airflow
Trane AHU
base (typical)
Field-supplied
rigid duct
Trane AHU
base (typical)
Field-supplied
rigid duct