CAH-SVX01B-EN 33
Installation - Mechanical
TCC Joining Sections - Edge-to-Edge
NOTICE
Microbial Growth!
The roof curb or foundation must be level and the condensate drain at the proper height for
proper coil drainage and condensate flow. Standing water and wet surfaces inside the
equipment can become an amplification site for microbial growth (mold), which may cause
odors and damage to the equipment and building materials.
NOTICE
Level Foundation!
A level foundation is critical to proper unit and door alignment, operation, and sealing. Failure to
level and align sections properly can lead to structural damage.
Important: Units must be installed level for proper drainage of condensate from the drain pan
and for squareness of the sections during installation. In addition, each section in a
multi-section unit must be properly supported.
Note: Leveling each section, beginning with the first section, is critical. Failure to level and align
the sections immediately creates greater misalignment or even structural damage
afterward.
1. The end section must be installed first making sure it’s properly aligned with the remainder of
the curb. Anchor this section securely so the base lugs can be used to pull the next section for
base connections.
2. For units with curb base, remove shipping blocks (see Figure 21).
Figure 21. Shipping block removal.
Remove shipping blocks