Trane Performance Air Handlers Installationshandbuch Seite 29

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 100
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 28
CAH-SVX01B-EN 29
Installation - Mechanical
TCP Indoor Roof Assembly - Multiple Span
1. Ensure shipping split sections are aligned and pulled together properly.
2. Apply a bead of caulk to full height of wall joint.
3. Apply 3-inch x 1/8-inch adhesive-backed foam gasket to inner joining strip.
4. Install inner joining strip using #14 x 1.5-inch gasketed tec screws.
5. Fit the pre-cut hub cap over the joining strip the vertical height of the wall flush with the roof
and secure it to the wall with #8 sheet metal screws.
6. Fill the top and bottom openings with caulk as a moisture seal. Screw holes can be pre-drilled
with a #29 bit.
7. Apply a bead of caulk over top corner of cap seam.
8. Using #10 sheet metal screws, attach corner seam trip cap as shown in Figure 16.
Figure 16. TCP indoor roof assembly - multiple span
6-inch trim cap
#10 sheet metal screw
CaulkCap and
gasket
Standing seam
10 ga. galv
#14 sheet metal screw
on 10-inch centers
18 ga. galv
Zip screws
Seitenansicht 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 99 100

Kommentare zu diesen Handbüchern

Keine Kommentare