Installation - Mechanical
Unit Handling Procedure
Lifting brackets are provided along the base rail on both
sides of the unit. Pass lifting cables through the 1. 5-inch
diameter holes in the brackets and install spreader bars
between the cables above unit. A label on the unit base rail
illustrates proper lifting procedure.When rigged properly,
the unit will balance at its center of gravity.
Perform a test lift to ensure balance, equilibrium and unit
level is maintained. Adjust rigging as required based on
initial test lift.Test adjusted rigging with second test lift.
Continue test lifting unit until satisfactory results are
obtained. Do not proceed with final lift until unit remains
static, level and stable during test lift. See Figure 12, p. 13.
Note: Maintain unit level throughout the lifting process or
structural damage may occur.
.
WARNING
Improper Unit Lift!
Test lift unit approximately 24 inches to verify proper
center of gravity lift point.To avoid dropping of unit,
reposition lifting point if unit is not level. Failure to
properly lift unit could result in unit dropping and
possibly crushing operator/technician which could
result in death or serious injury and possible
equipment or property-only damage.
Figure 12. Proper unit rigging and lifting procedure using spreader bars