Trane Gas Unit Heaters Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Herde Trane Gas Unit Heaters herunter. Trane Gas Unit Heaters Installation and Maintenance Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and
servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific
knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could
result in death or serious injury. When working on the equipment, observe all precautions in the literature
and on the tags, stickers, and labels that are attached to the equipment.
Gas Unit Heater
Tubular Gas-Fired Direct Spark Propeller Unit Heater
March 2012 GTND-SVX01B-EN
Installation, Operation,
and Maintenance
Seitenansicht 0
1 2 3 4 5 6 ... 52 53

Inhaltsverzeichnis

Seite 1 - Installation, Operation

SAFETY WARNINGOnly qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating,

Seite 2 - Environmental Concerns!

General Information10 GTND-SVX01B-ENFigure 4. Unit sizes 30–120: Component partsPressure switch Gas valveFigure 5. Unit sizes 30–120: Internal furnac

Seite 3 - Trademarks

General InformationGTND-SVX01B-EN 11 Figure 8. Unit sizes 150–400: Heat exchanger assemblyFigure 9. Unit sizes 150–400: Electrical control panelFigu

Seite 4 - Introduction

12 GTND-SVX01B-ENUnit Dimensions and WeightsTa b l e 1. Unit sizes 30–120: Performance and specification dataUnit Size 30 45 60 75 90 105 120PERFORMA

Seite 5 - Table of Contents

Unit Dimensions and WeightsGTND-SVX01B-EN 13 Figure 13. Unit sizes 30–120: Dimensions, standard units

Seite 6 - Model Number Descriptions

Unit Dimensions and Weights14 GTND-SVX01B-ENTable 2. Unit sizes 150–400: Performance and specification dataUnit Size 150 175 200 250 300 350 400PERFO

Seite 7

Unit Dimensions and WeightsGTND-SVX01B-EN 15 Figure 14. Unit sizes 150–400: Dimensions, standard unitsCE(Hanging)1-3/8"(35)(Hanging)GD32-1/2"

Seite 8 - Identification of Parts

16 GTND-SVX01B-ENInstallation: MechanicalSince the unit is equipped with an automatic gas ignition system, the unit heaters must be installed such tha

Seite 9

Installation: MechanicalGTND-SVX01B-EN 17 Air for Combustion. The unit heater shall be installed in a location in which the facilities for ventilatio

Seite 10 - General Information

Installation: Mechanical18 GTND-SVX01B-ENUnit sizes 30–120 only: The unit heater may be mounted with the vent outlet, gas and electrical connections

Seite 11

Installation: MechanicalGTND-SVX01B-EN 19 Note: See Table 2, p. 14 for “E” dimension.Nozzle AssemblyUse the following procedure for assembling the 30-

Seite 12 - Unit Dimensions and Weights

© 2012 Trane All rights reserved GTND-SVX01B-ENWarnings, Cautions and NoticesWarnings, Cautions and Notices. Note that warnings, cautions and noti

Seite 13

Installation: Mechanical20 GTND-SVX01B-ENlarger holes are facing the unit heater, create a sub-assembly by attaching the top panel (P/N 251-07942-00

Seite 14

GTND-SVX01B-EN 21 Installation: PipingGas Supply PipingPipe SizingTo provide adequate gas pressure at the gas unit heater, size the gas piping as foll

Seite 15

Installation: Piping22 GTND-SVX01B-ENPipe Installation1. Install the gas piping in accordance with applicable local codes.2. Check gas supply pressur

Seite 16 - Installation: Mechanical

Installation: PipingGTND-SVX01B-EN 23 Pipe directly in to combination valve (see Figure 21, p. 23).5. Gas valve has a pressure test post requiring a 3

Seite 17

Installation: Piping24 GTND-SVX01B-ENCategory IIncludes non-condensing appliances with negative vent pressure, like the traditional atmospheric unit

Seite 18 - Heavy Objects!

Installation: PipingGTND-SVX01B-EN 25 Standard CombustionAll Unit Sizes: Vertically Vented Unit Heaters (Category I)Observe the following precautions

Seite 19 - Nozzle Assembly

Installation: Piping26 GTND-SVX01B-ENAll Unit Sizes: Horizontally Vented Unit Heaters (Category III)Unit sizes 150–400: Horizontal venting arrangemen

Seite 20

Installation: PipingGTND-SVX01B-EN 27 • Unit sizes 30–120: Use 4” (120 mm) flue pipe.• Unit sizes 150–400: Refer to Table 2, p. 14.All heaters must be

Seite 21 - Installation: Piping

Installation: Piping28 GTND-SVX01B-EN• Unit sizes 150–400: Insulate single wall vent pipe exposed to cold air or running through unheated areas.Unit

Seite 22 - Pipe Installation

Installation: PipingGTND-SVX01B-EN 29 rating of 500°F, or 3M #425 aluminum foil tape (or equivalent).6. Avoid running vent pipe through unheated space

Seite 23 - Installation: Venting

Warnings, Cautions and NoticesGTND-SVX01B-EN 3 TrademarksTrane and the Trane logo are trademarks of Trane in the United States and other countries.WA

Seite 24

Installation: Piping30 GTND-SVX01B-ENFigure 28. All unit sizes: Horizontal arrangement, single wall vent system to single wall terminationVent pipe d

Seite 25

Installation: PipingGTND-SVX01B-EN 31 Figure 30. All unit sizes: Horizontal arrangement, single wall vent system to double wall termination12” min.(30

Seite 26

Installation: Piping32 GTND-SVX01B-ENSeparated CombustionUnit Sizes 30–120 Only: Category IIICombustion Air Venting and Piping1. The combustion air s

Seite 27

Installation: PipingGTND-SVX01B-EN 33 Z223.1 National Fuel Gas Code. In Canada installation must be in accordance with CAN/CGA-B149.1 “Installation Co

Seite 28 - Carbon Monoxide!

Installation: Piping34 GTND-SVX01B-ENFigure 33. Unit sizes 30–120: Concentric vent installationFigure 34. Unit sizes 30–120: Vertical intake/vent ins

Seite 29

Installation: PipingGTND-SVX01B-EN 35 Air Inlet CollarRemove screen and mounting plate from air inlet on rear panel of unit by removing 4 screws. Sec

Seite 30

Installation: Piping36 GTND-SVX01B-ENInstall thimble if required by local codes or type of wall construction. Concentric vent box may be fastened dir

Seite 31

GTND-SVX01B-EN 37 Installation: ElectricalElectrical ConnectionsStandard units are shipped for use on 115 volt, 60 hertz single phase electric power.

Seite 32 - Exhaust Venting

Installation: Electrical38 GTND-SVX01B-ENThermostat Heat Anticipator Adjustments. The initial heat anticipator setpoint should equal the thermostat’

Seite 33

GTND-SVX01B-EN 39 Start-UpAll Unit Sizes: OperationPower Vented Propeller Units—Direct Spark IgnitionExplanation of ControlsNote: Refer to figures:• U

Seite 34

4 GTND-SVX01B-ENIntroductionFor Your SafetyThe use and storage of gasoline or other flammable vapors and liquids in open containers in the vicinity of

Seite 35 - GTND-SVX01B-EN 35

Start-Up40 GTND-SVX01B-EN3. Turn on the electrical power. The unit heater should now be under the control of the thermostat. Set the thermostat to it

Seite 36

Start-UpGTND-SVX01B-EN 41 b. Remove the regulator adjustment screw cap, located on the combination gas valve.c. With a small screwdriver, rotate the

Seite 37 - Installation: Electrical

Start-Up42 GTND-SVX01B-ENTa b l e 10 . All unit sizes: Tubular unit heater high altitude manifold pressureAltitude (ft)Natural Gas Propane (LP) GasH

Seite 38

Start-UpGTND-SVX01B-EN 43 Gas Equipment Start-Up Customer _____________________________________________ Job Name & Number ______________________

Seite 39 - Start-Up

44 GTND-SVX01B-ENMaintenancePeriodic ServiceAll Maintenance/Service information should be recorded accordingly on the inspection sheet provided in thi

Seite 40 - Overfiring!

MaintenanceGTND-SVX01B-EN 45 close tightly, completely extinguishing the flame on the main burner(s).12. Inspect and service the motor/fan assemblies.

Seite 41

46 GTND-SVX01B-ENDiagnosticsTroubleshootingWARNINGHazardous Service Procedures!The maintenance and troubleshooting procedures recommended in this sect

Seite 42

DiagnosticsGTND-SVX01B-EN 47 G. Failure to ignite. 1. Gas supply is off. 1. Open all manual gas valves. Check for leaks.2. Lack of power at unit. 2.

Seite 43 - Gas Equipment Start-Up

Diagnostics48 GTND-SVX01B-ENN. Fan will not stop. 1. Control board is in flame failure mode.1. Turn 115V power off to the unit, wait 10 seconds, and

Seite 44 - Maintenance

DiagnosticsGTND-SVX01B-EN 49 1. Check the system thermostat to make sure it is calling for heat. (Do not cycle the thermostat on and off at this time.

Seite 45

Table of ContentsGTND-SVX01B-EN 5Warnings, Cautions and Notices . . . . . . . . . . 2Model Number Descriptions . . . . . . . . . . . . . . 6Indoor

Seite 46 - Diagnostics

50 GTND-SVX01B-ENWiring DiagramsFigure 42. All unit sizes: UT Control board

Seite 47

Wiring DiagramsGTND-SVX01B-EN 51 Figure 43. Unit sizes 30–120: Natural & propane (LP) gas with single-stage gas control & UT control boardN

Seite 48

Wiring Diagrams52 GTND-SVX01B-EN Figure 45. Unit sizes 150–400: Natural and propane (LP) gasFigure 46. Unit sizes 150–400: Optional two-stage igni

Seite 49 - Live Electrical Components!

Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the leader in creating and sustaining safe, com

Seite 50 - Wiring Diagrams

6 GTND-SVX01B-ENModel Number DescriptionsIndoor Gas Heating UnitsNote: All units are AGA approved. For CGA approved units, contact Air Handling Produ

Seite 51

GTND-SVX01B-EN 7 General InformationDescriptionThe Tubular Gas-Fired Unit Heater is a factory assembled, power vented, low static pressure type propel

Seite 52

General Information8 GTND-SVX01B-EN• Turn off the gas supply and disconnect all electric power, including remote disconnects before servicing unit. F

Seite 53

General InformationGTND-SVX01B-EN 9 Figure 3. Unit sizes 30–120: Unit parts #Description1. Vestible Panel/Tube Assembly (Heat Exchanger)2. Bracket/G